UTFacultiesEEMCSTCPSP projectSummary of the results

Summary of the results




b=1,0




b=0,9



Jobs


Instances

Work Content

Maximum CT(s)

Average CT(s)

Objective value

# with cost=0

Maximum CT(s)

Average CT(s)

Objective value

30

480

2,310.7

26.1

2.9

3.2

294


55.1


4.5


58.6


60

480

4,562.9

241.7

17.2

13.4

276


303.4


24.7


124.4


90

480

6,812.2

932.7

53.0

22.6

282


845.3


73.9


180.8


120

600

9,073.5

2,163.4

308.3

72.4

75


2,798.2


362.2


326.6