Research Data Management Plan

Purpose:             

Being able to reproduce the results after the student has left. There are no plans yet to for data management during a project or assignment.

For whome:

  • Students: all BSc-, MSc-, assignments
  • PhD students: all PhD students
  • All other assignments if publication is feasible

For what:                  

  • Research Data + Documentation, to be assessed by the supervisor of the BSc-, MSc- and PhD student
  • Research Data = measurement results, simulation results, programs (for simulation, control, and processing), executable scripts
  • Documentation = reports, measurement procedures, simulation procedures, code generation procedure (including versions of compilers etc).

When:                 

Not later than 1 month after finalizing the research.

Classification:

Classification

Access

Purpose

Storage duration

Open

Public

Share

Infinite

Internal 

RS only

Analysis/Design

As needed

Confidential 

Limited

Valorisation

As agreed

Personal

Author only

Protection of persons

Limtied by law

Storage: 

The Radio Systems group will provide (encrypted) storage on the RS-server.

Access:

Supervisor of the BSc, MSc or PhD student + Data manager RS group (to be appointed).